This project involved taking a newer home and nearly doubling the square footage.  A garage, master suite, 4th bedroom, and pantry were added.  The siding and rooflines needed to match the existing structure; this is important in any remodel project.  Our goal is to accomplish a 100% seamless transition between the existing building to the new addition.

This is in the beginning stages; the garage slab is poured.   Framing for the garage  
   
 

Framing for the second story, including the master suite and the 4th bedroom

  The crane arrives with the roof trusses.  
   
       
   
 

Sheathing is completed

     
   
 

Framing the interior of the addition

   

The drywall truck arrives

 
   
 

Siding installation begins

   

Drywall in the addition

 
   
 

Master Bath takes shape

   

New hallway leading to the master suite

 
   
 

4th bedroom

   

Master bath

 
   
   

 